MIZAN · release 3.0 · generated fixtures

Evaluation report

What the three systems decide on held-out generated data, what the statistics promise, and where the evidence is still thin. Every number on this page comes from reports/evaluation/*.json.

SANAD · procurement evidence

Each set is a regression suite for one grammar version. A false MEETS means the system approved a requirement it should not have. The baselines never abstain.

BASIRA · what one calibration bank guarantees

Banks whose long-run false-alert rate exceeds 5%

Split conformal (shipped rule)PAC rule, δ = 10%10% bound (δ)
Show data

RASID · decision quality, not only forecast error

Share of the achievable battery value each policy captured

0% is running without a battery, 100% is the hindsight reference that plans each day on the realized load.

Expected cost against tail cost

Tail cost is the mean of the worst 10% of days (empirical CVaR90). Down is safer, left is cheaper. The no-battery policy is off this scale.

Paired differences in mean daily cost

95% moving-block bootstrap interval, 7-day blocks. An interval that crosses zero is not resolved by these 60 days.

Show data